Last updated: November 2026

Oregon requires contractors on residential jobs to hand homeowners a short stack of state forms. They are easy to sign without reading. Each one tells you something you will want later, and a missing form can change the contractor's legal position.

When the notices are required

The rule follows the written-contract threshold. When ORS 701.305 requires a written contract (residential work over $2,000), OAR 812-012-0130 requires the contractor to deliver the consumer notices on or before the date the contract is entered into. The contractor must keep proof of delivery for two years: a signed copy, an initialed phrase in the contract acknowledging receipt, or the notices printed in full inside the contract.

The CCB adopts each form by rule in OAR 812-001-0200 and posts them on its Contractor Tools page, including a combined version with all three on one document.

1. Consumer Protection Notice

Required by: ORS 701.330(1). Current form revised April 26, 2011.

This one-page form covers licensing, bonds and insurance. The CCB's form tells you to check the license before signing and makes several points worth reading twice:

  • Licensing "is not a guarantee of the contractor's work."
  • The CCB bond provides "a limited amount of financial security" and "is not intended to be a safety net for consumer damages." The form suggests looking into performance bonds on large projects.
  • Liability insurance covers property damage and bodily injury the contractor causes. "It does not cover contract disputes, including poor workmanship."
  • If the contractor is not licensed, the CCB bond and dispute resolution services are not available to you.

It also warns against automatically taking the lowest bid and against paying in full before the work is complete.

2. Notice of Procedure

Required by: ORS 701.330(2). Form dated December 4, 2007.

The full title is "Notice of Procedure Regarding Residential Construction Arbitrations and Lawsuits." It warns you that before you start an arbitration or lawsuit over construction defects, Oregon law requires you to send written notice of the defects, let the contractor inspect and test, and give the contractor a chance to offer to repair or pay (CCB form). You do not have to accept the offer.

Skipping those steps gets an arbitration or lawsuit dismissed (ORS 701.595). The deadlines and steps are laid out in Oregon's construction defect notice rules.

3. Information Notice to Owner About Construction Liens

Required by: ORS 87.093. Form revised January 1, 2010, per OAR 812-001-0200.

This is the notice with teeth. Each original contractor must deliver it to the owner when signing a residential construction or improvement contract over $2,000, and to the first buyer of a residence the contractor built and sold within 75 days after completion (ORS 87.093(2) and (4)). It must go by personal delivery, registered or certified mail, or first-class mail with a certificate of mailing (ORS 87.093(3)).

The CCB's form explains:

  • Subcontractors, suppliers and workers your contractor fails to pay may lien your property "even if you have paid your contractor in full."
  • If you live in or will live in the home, those parties may file a lien only if they sent you a timely Notice of Right to Lien.
  • Liens generally must be recorded within 75 days of substantial completion, or of when the claimant stopped work, whichever came first, and enforced by a lawsuit within 120 days of filing.
  • Ways to protect yourself, including lien waivers or releases before each progress payment, joint checks, an escrow agent, and title coverage.

The form also says: "Signing this Information Notice verifies only that you have received it."

If the contractor didn't deliver it: the original contractor "may not claim any lien" on your property for labor, services or materials under that contract (ORS 87.093(6)). The CCB may also suspend the license or impose a civil penalty of not more than $5,000 (ORS 87.093(7)). Separately, an original contractor who needed a written contract under ORS 701.305 and didn't have one may not claim a lien either (ORS 87.037). Neither rule stops a subcontractor or supplier who sent you a proper Notice of Right to Lien. See Oregon lien law for homeowners.

Other notices you may see

Notice When it applies Source
Information Notice to Property Owners About Construction Responsibilities You pull a residential building permit as an owner using the ORS 701.010(6) exemption. The permit office gives it to you. ORS 701.325(2)
Notice of Right to a Lien A subcontractor or supplier you did not hire directly has started work or delivered materials. ORS 87.021, 87.023
Notice of Buyer's Right to Cancel The contractor sold you the job at your home or anywhere other than its place of business. ORS 83.730
Written warranty offer and maintenance schedule New home construction or sale by the builder. ORS 701.320, 701.335
Notice of Compliance with Homebuyer Protection Act Purchase of a new home, or one with $50,000 or more of work completed in the three months before sale. ORS 87.007, OAR 812-012-0140
Home Inspection Consumer Notice You hire a home inspector. OAR 812-001-0200(7)

On a house built before 1978, the CCB also tells contractors to give you the EPA pamphlet "The Lead-Safe Certified Guide to Renovate Right" before renovation (CCB Contractor Tools). More in Oregon's lead-based paint renovation license.

What to do with the notices

Read them before you sign the contract, sign where asked, and keep your copies with the contract. If your contractor skipped them on a job over $2,000, write down the date you noticed and keep it with your project file. That fact may matter if a lien or complaint comes up later.

Related pages

Sources

Frequently Asked Questions

What notices does an Oregon contractor have to give a homeowner?

When a written contract is required (residential work over $2,000), the contractor must deliver the Consumer Protection Notice, the Notice of Procedure and the Information Notice to Owner About Construction Liens on or before the date the contract is signed, and keep proof of delivery for two years (OAR 812-012-0130).

What happens if my contractor didn't give me the lien notice?

Under ORS 87.093(6), an original contractor that fails to deliver the Information Notice to Owner may not claim a construction lien on your property for that contract. The CCB may also suspend the contractor's license or impose a civil penalty of up to $5,000 (ORS 87.093(7)).

Does signing the lien notice give my contractor lien rights?

No. The CCB's form states that signing it verifies only that you received it and gives no one additional rights to place a lien on your property.